Marine Sound Control    
An ADE Development Company     
PROJECT INFORMATION NEEDED FOR PROPOSAL EFFORT
PROJECT:         DATE:      
ATTN:        
Drawing:
REQUESTED:
AVAILABILITY:
   COMMENTS:
INBD. PROFILE      
OUTBD. PROFILE      
GENERAL ARRANGEMENTS:          QUARTERS      
MACHINERY      
F      
THERMAL      
ACOUSTIC      
JOINER SCHEDULE      
SHEATHING SCHEDULE      
MID-SHIP'S SECTION      
SCANTLING PLANS      
HULL PLATING/FRAMING      
MACHINERY FOUNDATION DETAILS      
HVAC DIAGRAM      
HVAC DESIGN DETAILS      
       
OTHER INFORMATION NEEDED:     COMMENTS:
MASTER EQUIPMENT LIST:     ID MACH'Y TYPE,
HP, RPM, NO.
      BLADES/PISTONS VENDOR, MACH'Y
      TYPE: RECRIP/CENTRIF/ETC.
      NUMBER OF UNITS
       
PROPELLER DESIGN PARAMETERS:      
NO. BLADES      
RPM      
TYPE (FIXED, CP, etc)      
DIA.      
P/D      
       
FOR ISOLATION MOUNTED EQUIPMENT:     UNITS
UNIT WT, DRY &WET     lbs
CENTER-OF-GRAVITY     x, y, z wrt.
Reference pt.
MASS MOMENTS-OF-INERTIA     lbf-in^2 or lb-sec-in^2
LOCATION OF MTG. FT.     x, y, z wrt to cg or reference pt.
       
FOR ISOLATION MOUNTS:     If vendor supplied/ specified/ or selected
LOAD RANGE:     lbs
MAX     lbs
SPRING STIFFNESS:                                   STATIC     lb/in
DYNAMIC     lb/in
TYPE/MANUFACTURER      
       
FOR HULL VIBRATION:      
MOMENT-OF-INERTIA, midsection      
VERTICAL     in^2-ft^2, or in^4 or ft^4
TRANSVERSE     in^2-ft^2, or in^4 or ft^4
POLAR MOMENT-OF-INERTIA      
CROSS-SECTIONAL AREA, MIDSHIPS     in^2
LENGTH BETWEEN PERPEND.     ft
MEAN DRAUGHT     ft
BEAM     ft
DISPLACEMENT     tons
       
OTHER INFORMATION REQUESTED:      
VESSEL SPECIFICATION OR REQUIREMENTS      
NOISE GOALS/REQUIRMENTS     Operating conditions
MACHINERY VIBRATION REQUIRMENTS      
HABITABILITY VIBRATION REQUIRMENTS     Operating conditions
CLASSIFICATION / REGULATORY REQ.     ABS, USCG, etc.
OWNER / SPECIFIED NOISE&VIBRATION      
TREATMENTS TO BE INSTALLED      
       
Marine Sound Control 2003